Air Ride Technologies’ new fabrication shop is in full operation. All machinery and equipment has been moved in and hooked up.
Lets take a tour!
Upstairs we have Amber’s Shock room. Amber assembles & test every single adjustable shock used in the Shockwave units.

Down stairs we have the welding room. Dave, Bret, and Josh melt our parts together.

In the center is CNC central. John, Tim, Cassey, man these metal eating monsters.

Towards the front of the shop is Rodney’s Area.
Rodney develops all the air suspension systems. Currently he is working on 2nd gen Camaro TigerCage.

The office area is complete and everyone is moved in. The break room is about 75% finished. We hope to have it finished soon.



Here is the receiving area. Greg makes sure everyone has the materials needed to keep those machines running non stop.




